Drilling is usually required for the installation of reservoirs and wells.That is why the question of how to drill a hole with their hands, often gets to the people who live in private homes.Here there are a number of nuances and features that are important to know in order not to spoil the whole thing.That is why correct to trust the professionals.However, if you decide to do it yourself, you should know how to drill a well on the site.
The first thing to mention some of the nuances.If auger during stumbles on clay, after lowering the casing into the sand its need to scroll through several times around its axis, which will penetrate the clay layer, wherein the water is flowing into the barrel.Thereafter, it is necessary to insert a coil diameter which is smaller than the casing.Further drilling is done through-meter depth.The tube can then be lowered, which will allow it to settle firmly in the clay, thereby not letting the water down.Next you need to drill to the next layer of gravel or sand.The casing should be lowered until it stops, and it is necessary to clean the barrel bailer and then lower it back down, continuing drilling.By means of the water pump can be pumped from a specific well, to determine its quality.Talking about how to drill a well with your hands, it should be said that the experience will be considered successful if it was made before the middle of sand and gravel.
To the well was really high quality, along with the centralizers must be lowered into the production tubing, the diameter of which is less than half the drill casing.The bottom of the inner tube is required to close the lid placed on the blank part of the drill stem.Located above the filter section, after which again is part of the solid to the mouth.
If you want to know how to drill a well with your hands, you must follow the guidelines as closely as possible.Between pipes should fill sand or gravel.This is done to reduce the rate tightening pipes of various contaminants to slip through the filter.Filling made layers, the thickness of each of them must not exceed half a meter.If together with the casing goes up pump part, it must be pressed down.The casing can be removed, after which produce obsypaniya.When the gravel is at around one and a half meters above the filter, you can start filling the annulus, or a mixture of bentonite swells when wet.
clear that the equipment for drilling of wells should be of high quality, otherwise the result is not too good, and the work - difficult and long.If the pump casing is somehow misses heterogeneous impurities, it is necessary to continue the process of sealing up to two-meter level.Talking about how to drill a well with your hands, it should be noted that when the sealing of the pump tube can be pulled out of the drill casing it and got a space to fill in the soil.