How to build a sauna yourself?

Distribution trend of construction of chopped houses facilitated the application of the same technology for the construction of a bath.This requires pine logs having a diameter of not more than twenty-two centimeters.In such timber contains flavoring.They stand under conditions of elevated temperature and humidity, and also possess bactericidal properties.Since the entire timber can "breathe", the room does not require venting.

Build a bath with his hands will be much easier if you break the process into stages:

1. Design and calculation of the size of the room.It is with this and start construction.Two standard frame sizes will be 3 * 5 m, and the option of three rooms with separate steam room provided - 6 * 6 m. The main thing - to calculate the height of the ceilings.In order to keep warm, they have to be low, but do not forget about comfort.

2. After the design is finished and we know what construction materials would be required and how much you need to start their purchase.

3. The next step is the preparation and installation of foundations.The depth of its placement should be calculated on the basis of the level of soil freezing for a particular area, and exceed it by ten centimeters.

4. In order to build a sauna correctly, you must adhere to the walls of the main assembly technology.Often used as a log cabins debarked wood.It is a timber from which only the bark is removed.Bath, arranged from a tree with rough and knots, will always look very stylish.

5. The next element is the construction of the roof.To build the bath quality is required to select the correct version of the roof.Gable view will be more suitable for a small, separately located structure and pent roof is most common as an extension to the main building.The inclination angle in the first embodiment should be between twenty to forty degrees, and the second - between twenty and thirty.Build a bath should be with the installation of the heavy roof.The most appropriate option would be a Norwegian technology design earthen roof.It will be warm enough heavy and convenient in operation.In winter precipitation in the form of snow will not accumulate and become and will drain water.

6. It is important to correctly position the bath furnace stove that once heated it provided all the facilities.It is built capacity for hot water and heat as the drives are used granite stones.They are heated by means of emerging from the firebox of the furnace gases.This oven is designed for continuous furnace firewood.

7. After the basic work is completed, to build a sauna quite easily.It is necessary to take care of weirs and device chimney.You can then produce floor insulation, ceilings, and perform interior decoration of all rooms, the installation of shelves.Before you start the whole process of construction, need to know how much it costs to build a sauna, decide to consult specialists or not.