How to align the floor under the laminate without the involvement of experts

current technologies and materials help to perform some types of home repairs on their own.To put an example, flooring (laminate) do not need to search for experts for stowage.It easily can be done by yourself.When you learn the nuances of this business work for you will turn into a small folding designer on special latches.In passing, you can buy some building skills for the future.

How to align the floor under the laminate?

For starters look and evaluate the condition of the floor surface, which will need to make laying the laminate.The maximum tolerance of his irregularities should not exceed 2 mm per 1 meter.Do not ignore this rule.When the curvature of the floor above this value in the near future at the new beautiful laminate will crack.

You need this headache?No?Then you will be examined to properly align the floor, and you will not need to remember with bitterness the expression that the miser pays twice.Just imagine that you will need to redo what has already been done, and still have to level the curve the floor.

How leveling floors under laminate wood if they are?

eliminating irregularities, it is necessary to pay attention to progibaemost vygibaemost and sex, as well as its squeakiness.If defects are present, they should be eliminated.Insufficient rigidity of the floor will cause him replaced in whole or partial repair.

Attention advice!

for floor leveling, do not use chipboard.This material does not have an adequate level of environmental performance, using formaldehyde can be released.

Now consider how to align the floor under the laminate, if concrete.With these floors "headache" is much less.If the floor is very uneven, will have to make a cement screed.The proportion of sand and cement - 4 x 1. Small flaws leveled floor Self-leveling liquid mixtures.They divorced in the proportions indicated on the package.

for mixing required :

  • Drill.
  • Needle roller.
  • Special nozzle mixer.
  • Containers for mixing.

Before laying laminate flooring screed must dry completely.Fully hardened mixture - this is not the fact that it is completely dry!In terms of drying affects the thickness of the leveling material and temperature.To improve the leveling properties of the mixture and to speed up the drying time, it is possible by means of the plasticizer.

Well, how to align the concrete floor, we are also clear.Now is the time laying laminate.

Before laying laminate flooring it should withstand a couple of days in the room where it is supposed carpeting.This is to cover the adaptation to the temperature conditions of the home.Even if the floor is smooth, it is still necessary to put noise insulating substrate and then laying the laminate.

After reading this article, you have a concept of how to align the floor under the laminate.The result of following the advice above will be laminated coating that will last you an incredibly long time.