Each of us in his life had to make repairs.Recently, people have become increasingly interested in how putty ceiling with his hands, as not everyone has the opportunity to hire a construction crew or working.It should be noted that to do so is not difficult, just need to know the technology of the procedure.
First of all, you should choose the appropriate hardware and prepare the surface to work.You will need to mix for spackling, the capacity in which you will be able to prepare it, spatulas and sandpaper.Keep in mind that you may need a mixture of two kinds: for roughing and finishing work.It depends on whether the surface is flat.
Naturally, you will immediately ask the question: "What putty ceiling?"It's simple: you must select the mix that made reliable manufacturer.For rough work, you will need a coarse plaster, and for finishing - fine grain.Moreover, it can be sold in ready form.
course, need to talk about the surface to be processed.Before putty ceiling, they must be prepared: remove the old finish, to cover all holes, cracks and other defects.If major repairs done, then removed all the plaster up to the slabs.To the mixture adheres better, you need to prime the surface.If the ceiling has a slight slope, it must be removed with a coarse mixture.This flatness can be checked with the help of the level.
Before putty ceiling, it is advisable to attach to the surface of the reinforcing mesh.It is better to fasten the mixture and give her a crack in the future.Apply the material must be precise movements.Do not forget to monitor the thickness of the layer: it must be the same everywhere.Bands from the trowel on the surface should not be - they need to immediately smooth.
Before ceilings finishing putty mixture, make sure you completely dry the previous layer.The surface must be completely dry and free of wet spots.The thickness of the second layer can not be greater than 4 mm.Its cast as well as the previous one.In this case, you can not allow any irregularities and stripes.The surface must be perfectly smooth.If any flaws were, after drying, they must be immediately removed using sandpaper.
All these actions can be performed on plasterboard.Only in this case it will need much less a mixture, because you will be able to align the ceiling with the help of sheets.In order to surface there were no traces before putty plasterboard, it is necessary to cover the seams.To do this, they applied a narrow band of reinforcing mesh is embedded and mix.After that you can perform all the above operations.In this case the preparation ceiling leaves much less time.
Make all this work on their own it is possible, you just need to be patient and not to rush.Good luck!