In order to keep records of fixed assets, such as buildings, houses, and other facilities necessary to carry out the commissioning of these facilities.At the same time this procedure are subject to all kinds of real estate, machinery, equipment and so on.
document, in accordance with which the introduction of the fixed assets, - permission to enter the facility.It is the act recognizes that the building, structure, plant or factory building meets all specifications and are ready for use.This document is used after the construction of "from scratch", modernization or reconstruction, a complete overhaul of the object.Get this form can be in the local department of urban planning and architecture.To do this, you must submit a written application and all required supporting documents.
order to become the owner of a permit for commissioning of the OS is supposed to collect the following forms:
1. Documents confirming the right of the land owner.
2. The plan of land approved by the city planning committee.
3. issued by the competent authority permission for the construction / reconstruction of the building or premises.
4. Act on the acceptance of the object subjected to capital repair (in the event that the modification has been performed on the basis of a contract).
5. experts endorse a document confirming full compliance with the requirements of the primary means of regulatory, technical and other standards.
6. Blank, in which it can be argued that the work carried out in full accordance with the project plans.
7. Arrangement modified (repaired, constructed) object, its utilities and communications.
8. The explanatory note.
9. Protective fire-fighting measures.
10. Events describing actions to protect the environment.
11. Other documents.
permit for commissioning of the object lists all the regulations and norms according to which should be carried out the construction or modification of the asset.This document also allows authorized to issue and confirm ownership of this object.With a resolution is made to connect to the network communication facilities.
Commissioning of equipment usually almost always implies the existence of another document - the act.In this paper indicate: the date of the introduction of a fixed asset into use, the physical address where is this building, structure or house, listed the necessary operating conditions, as well as other important items.
This act may be annexed to the main document - the agreement on the provision and delivery of services.Also, the basic blank can be another paper.Thus, the supply agreement or other agreement also provides commissioning of the equipment.Act depends on the category and the ultimate goals of the use of the object.It may contain a variety of specifications, quality description, having a huge impact on the future implementation of the smooth operation of the equipment.And the main point, left out in the act, is information about the object under all possible standards of fire safety and other requirements and state standards.