How to fill the floor of the apartment?

repairs in the apartment usually starts with the floor, so a lot of questions.In this situation, it is important to do the right thing.The question "how to fill the floor of the apartment" - is very important, as is usually the floor is not perfectly flat.

Many do not know how to do it right.The first step is to get rid of the old coating, if any.Once you get rid of it, it is necessary to clean the subfloor and remove all dust.The entire surface abutting the floor to the walls is required to cover the waterproofing mastic.It is important to pay attention to the joints, as well as places of passage of pipes and all kinds of cracks.They pose the greatest risk of leakage.Talking about how to fill the floor of the apartment, it should be noted that, after you all processed mastic, is required to produce flooring Isoplast roll, giving greater protection, as well as providing waterproofing floors.Only then you can begin to proceed.

If we talk about how to properly pour concrete floors, it is worth noting that at the next stage, you need to install beacons, corresponding to the level of future sex.This is done using a special profile, which almost does not bend, allowing to provide a smooth surface.Under it is necessary to lay a cut squares of drywall to get the desired height, and then you can grab the cast, which will fix the beacons.

When the installation of these elements will be completed, will be clearly visible on any floor level rise, as well as how much space you need to fill.If the floor will rise to a height of more than 5 cm, it is recommended to pour concrete block.This is done to avoid too much load on the ceiling, in addition, it perfectly absorbs moisture.

considering the question "how to fill the floor of the apartment," you must say that you are ready to continue to work directly with cement, but before that requires primed surface.The solution is made of a dry cement mixture, which is quite possible to buy the building market in your town.For starters filled subfloor, which must dry thoroughly before you begin the rest of the work.In fresh screed can be walked in a day, but put the cover is too early.

can now consider how to fill in self-leveling floor?When roughing screed is completely dry, you can start pouring self-leveling mortar.Sex should again qualitatively dry.After that, the ideal surface is ready, and then it can be laid any cover that you like: laminate, linoleum, flooring, ceramic tile, or something else.

Now that you know how to fill the floor of the apartment, you can do it yourself.You can then proceed to the other works in the room.It is important to remember that when buying a variety of building materials is necessary to look at their shelf life, since many of dry mixes these terms are very limited.