How to pour the foundation?

click fraud protection

question "how to pour the foundation?"It is very important, because in the process of construction of buildings do not have any points that could be called insignificant, because each of them depends on how quality is the base of the object and its subsequent fate.Fill the formwork concrete mixture - this is one of the key stages of construction.By this stage, you are ready in the event that all excavation work has been completed and the formwork and hydro installed also must be ready reinforced frame.

If we talk about how to properly pour a foundation, here it is worth considering a number of ways.Selection of a specific one dictated by the difference in cost money and time.The most cost-effective, but time consuming, is to pour the foundation yourself when preparing the concrete is carried out directly on site with the use of compact mixers.Such equipment may be of different volumes, from 50 liters or more.The number of cycles will depend on the performance of the equipment.Talking about how to properly pour a foundation, is to say that one pair of hands to do all this work will be very difficult, especially when it comes to large scale structure of the future.Typically, cement mixers located in the vicinity of the filling.It is desirable that the foundation has not been more than two layers, if this is not possible, it is wise to fill it at a height of formwork.Each layer of the concrete to be compacted, so that it is not formed in the cavity.For this procedure, you can use the means at hand, or rent a deep vibrator, can significantly reduce the amount of work.

Talking about how to pour the foundation, it should be noted that after laying the last layer is necessary to cover the entire structure with a protective layer of roofing material or film.

Consider another method.You can call the truck mixers.This option is more expensive than self-priming, but one approach allows pour the foundation for the entire house, the quality of work will be as high as possible.One Agitator truck capable of delivering 4-8 cubes, and if necessary you can order a few cars, it all depends on the needs of the concrete.The preparation process in this case boils down to, to make special gutters.They allow you to pour the mixture into the most secluded place formwork.

Talking about how to properly fill strip foundation, it should be noted that by using the mixer, the solution should be distributed to several points of the formwork.The only way to obtain even distribution of the mixture according to the desired volume.If you make a fill at one point, you will need to spend a lot of effort to distribute it across the formwork.

You can use a concrete pump.This variant is relevant only when there is no possibility to approach to the construction site, and the use of the chute, the length of which is several tens of meters, is irrelevant.In this case it is necessary to be prepared for significant financial costs.

Now you have an idea how to pour the foundation of the house.