How to mount a GVL for sex?

gypsum sheets (UDK) - a popular decoration material, which is based on gypsum.To reinforce the strength of his fluff pulp and other materials.In contrast to the same "drywall" this material is completely homogeneous, which greatly increases its value to decorating.In particular, it is possible to use GVL floor.

The easiest way to do this is by using dry screed, as it has many positive qualities.In particular, when using wet varieties have to wait until the material is dry, simultaneously preventing the ingress of moisture in the lower floors.If you lay a dry GVL floor, while the work is reduced, and the upper floor will be laid on the same day.It is very important before starting work to produce expanded clay insulation, which also serves to equalize the surface.For the vapor barrier can take any high-quality polymer film.

Getting laying

defined with this, on the perimeter of the room should be well fixed skirting tape.It has two important functions: first, the tape acts as a "shock absorber", avoiding material degradation from vibration tool.Secondly, it also prevents deformation GVL floor with sharp temperature fluctuations.

After packing tape should be as gently as possible to cut off the excess on the edge of your future floor.Cutting off, put on tape or asphalt roofing felt (do not forget to put a pre-polyethylene).Material placed overlapping.Then crumbled concrete block, the diameter of the fraction not exceeding 5 mm, constantly adjusting spending on the construction level.After that, Coating can ram.If the thickness exceeds 0.1 m, it is best to do this by dividing the entire volume of several layers, compacting each of them after falling asleep.

first sheet GVL floor begin to put on the angle.The surface material is greased special mastic or conventional PVA adhesive, and then in the perpendicular direction strictly mounted a second layer of GOLS.

sure to remove any excess putty that will inevitably act Intermedia seams.If in the future you will be laid something like laminate joints need to be carefully proshpaklevat.When everything is ready, GVL floor can be primed.

Note!

Trim material size need only after laying the last row.So you'll get not only the uniformity of installation, but do not let the coincidence of seams in different layers.Otherwise, possible drawdown floor.To work better to use power (greatly facilitate your work) with a small tooth pitch.

Note that in the first row width of joints in any case should not be more than two millimeters, so go to the fitting sizes seriously.In addition, we have already mentioned that when laying a layer of expanded clay need to constantly check the level.If you will have some flaws, the laminate sheets laid on top, over time inevitably deformed.

We hope that you have learned about all the possibilities that give lists of GVL floor.Their price varies from 100 to 170 rubles per square meter.