Laying nets for aerated concrete, as well as for other types of building materials, is designed to strengthen the building, which allows to increase the resistance of the last high loads.It also prevents the deformation related to uneven shrinkage of the building and the ground underneath, from the effects of wind and temperature changes.It is a monolithic reinforced concrete structure, located around the perimeter of the building.
Why make Laying nets for aerated concrete?
This procedure is mandatory, and that there are a number of reasons.They should also talk about in more detail.During construction of the roof truss construction mauerlat attached to the wall using anchors and studs, creating a point load.Aerated concrete is unable to handle the load, and because of this in the blocks may crack.When it comes to used truss system of hanging structures on the walls creates an additional burden.It has a bursting effect.Laying nets for aerated concrete in this case is not only necessary to make the frame stiffness, but also for the distribution of the load on the whole house.
If the beam truss system will be laid directly on the concrete, it can lead to a variety of troubles.Unless Laying nets slightest deviation of the level of the roof may cause the occurrence of point loads, which leads to cracking.
During the construction of two-storey buildings need to organize more reinforcing belts, at least two.The exact amount depends on the chosen material for walls.Always arranged Laying nets for aerated concrete between the first and second floor, which is associated with the support overlaps it.Between the second floor and the roof, he also needed.It is possible that you will need to make the foundation Laying nets.
should figure out how to do it.Typically formwork reinforcing belt is formed as a frame made of boards, fastened on the outer side.This method is not only the easiest, but most often used.Usually enough height of 30 centimeters, and its thickness should not exceed the width of the wall.Or you can make it a bit already.The lower part of the casing is attached to the wall by means of screws, and on top of the need to use cross-ties every 80-100 centimeters.This will keep the concrete structure by pouring.
If you are interested in further wall insulation, aerated concrete for the Laying nets do not cost flush formwork better to shift a little bit deeper.These niches are then filled insulating material.
If the overlap will not be used concrete slabs, it is enough to make the frame of a pair of reinforcement bars, which are connected by bridges.It will be designed as a ladder.At larger loads should be made more robust framework consisting of four rods, in the context of the form of a square.If we talk about how to make Laying nets, it is important to say here that it is possible to use the ready-mixed concrete.At the same time it should be labeling and M200 above.
Laying nets for 4-5 days will be ready, after which it will be possible to remove the formwork.