Novocherkassk GRES is located in 53 km from Rostov-on-Don.Consumers are its electricity, mostly in the southeast region and the North Caucasus.
Novocherkassk GRES was designed for capacity of 2400 MW, with eight power units of 300 MW.Cogeneration capacity - 75 Gcal / h.The designs of the design was different: 3x100 MW, 4h150, 4x200 (and stopped at 6h300 MW).Later we decided to build two more blocks (300 MW).Project fuel - coal or gas, fuel reserve - fuel oil.Today Novocherkassk GRES - the only one working in the coal mining and coal preparation waste (so-called culm (dust, sludge)).
Construction began in 1956 and the summer of 1965 has been completely put into operation the first unit.The pace of construction of the next 7 years - 1 unit per year.In winter 1972 - 1973 years of construction completed.By 2000, the finished pipeline and two units were transferred to the gas, and the rest continued to burn oil and coal dust.In 2007 we began the construction of the ninth block.On the block is completely Russian production will use circulating fluidized bed technology.This technology is optimal for the requirements of environmental protection and European standards on emissions.Start of the unit is scheduled for December 2014. In three kilometers from the station was built for the village Don Power.Today, the station abandoned the village, leaving its inhabitants in the lurch.
Novocherkassk GRES is constantly being upgraded.In 2011, we finished the reconstruction of water treatment plants Don water.The new system will use a membrane purification technology.Prior to that, the water boiler was purified by mechanical means, ie. E. Filtered, and later entered the chemical cleaning, and now you can give it up (and from the reagents, too).This will significantly reduce the environmental impacts and the population of the city of Novocherkassk and the entire region.Modernization and gas purification.Start up the new electrostatic precipitators at the fifth, seventh and eighth units (as a result of the degree of purification increased to 99.5%).
Yaivinskaya Power Plant was built near the village Yaiva Perm region.It belongs to the concern "E.On" from Germany.Construction started in 1955. In 1963 he earned the first block, and two years later - the remaining three.Power Station units 1 016 MW, heat capacity - 49 Gcal / h.Project fuels - coal Kizel and Kuznetsk basins.Since 1987, the basic fuel - natural gas.May 28, 2013 began to burn associated gas from fields owned by OOO "LUKOIL-PERM".Power Plant supplies electricity to the region and Verkhnekamsky enterprises Berezniki-Solikamsk industrial hub.As part of the station in 2011, working on a new natural gas combined-cycle power unit of 425 MW at a high efficiency.Up to 2022 disposal of associated gas will be increased to 95%.Yaivinskaya power station - the latest in the Russian Federation, which was transferred to the use of associated gas.Associated gas will go into the furnace without further purification.
Stavropol GRES - IES, located in Solnechnodolsk Stavropol Territory.Its power - 2400 MW, heat - 220 Gcal / h.Project fuel - natural gas, emergency back-up - fuel oil.The share of TPP in the energy opportunities of the North Caucasus - 25%.The volume of electricity production - 35%.The first of the eight 300 MW units was launched in 1975, and the last - in 1983.
In the coming years, will begin construction of a new power unit of 420 MW.This unit will be combined cycle with an efficiency of about 58-60% (compared to the current efficiency of the power generating units 33%).The unit will start in 2016, leading to a reduction in gas consumption, reduce the cost of electricity, stack emissions and warm water.Excess power will be sold to Georgia and Azerbaijan.In 2007 - 2009 years was supposed to expand the TPP into two blocks of 800 MW, but due to the differences of the customer and builders work were thwarted.A terrorist act at the Baksan hydroelectric power station forced to reconsider the position of the security GRES.Build an integrated system of several lines of defense against terrorist attacks GRES.