Bungalow for construction

Sheds, construction site - a small temporary structure designed for a comfortable stay for construction workers directly on your site.In most cases it happens that the shelter must be transported from place to place according to the conditions of construction.In this case, the best option would be to order the lifting work, which will make loading, unloading and assembly of mobile buildings without compromising the structural and qualitative characteristics of the structure.

Under rigging imply dismantling, transport and installation of the new location of mobile facilities.To carry out this type of work using various special equipment.Sheds, construction site has a fairly heavy weight, so, first of all, for the loading and unloading operations using special cranes.

addition to lifting operations are also used, low loaders variety of modifications, manipulators, hoists, jacks, and other special equipment.All equipment is practical enough, has good performance and is safe to use.

All the special equipment used for this type of work, has all the characteristics that are responsible for the safety and reliability of the loading and unloading of a temporary building.These include:

  • perfection of technology;
  • High profitability;
  • Practicality and versatility;
  • Complete safety and reliability;
  • Excellent performance power.

before being transported cabins, you must hold a preparatory stage.It made it in order to create suitable conditions for lifting work in the future and to ensure complete safety of the ongoing process.

to start building cabins being measured, which makes the engineer rigger.It takes measurements with the doors and windows inside the building, as well as calculates the maximum load bearing structures.After that, the expert thinks the whole subsequent process, each stage of which is quite significant.
Sheds, construction site often exposed to the carriage from one place to another.Therefore, it is important to consider the whole process of the rigging.Often it consists of:

  • mounting and dismounting;
  • Slinging bridles and cargo;
  • knotting of fasteners;
  • Splicing hemp and wire ropes;
  • selection and packaging production;
  • installation of special lifting machinery and equipment;
  • lifting, moving and lowering.

When construction is subject to change house transportation, it is important that the process of the rigging ruled an experienced foreman.Only professional technician can monitor the correct implementation and arrangements for loading and unloading of mobile buildings.In this case, the lifting will be handled according to all rules and regulations that ensure the safety of construction workers and the safety of machinery and equipment that is used for this type of work.