What sewerage well opt for a part of the house?

Almost all of us have become very attached to comfort.A normal level of comfort is impossible without high-quality sewer system.That is why the talk about how to choose a sewerage well of the house.

difficulty lies in the fact that in rural areas is almost nowhere centralized sewage system.Of course, it is easier and better to do the drain system at the stage of building a house, but it is really to do this and after.There are a few of the most common types of it.These include simple cesspool, septic tank or sewage filtration type well.Something concrete advice is difficult, since the choice depends not only on your preferences, but also on the characteristics of the area where you live.

easiest way to build pit runoff.The disadvantage of this system is that it must be periodically cleaned.You can use the fecal pump, but it is easier to hire the services of professional scavengers.There is one restriction: cesspool can be done only where the water table beneath the surface of the soil.The depth of this hole for proper drainage must be at least 2.5 meters, the wall should be spread brick, or use for this purpose concrete manholes.

To protect yourself from unpleasant odors, this system should be located on the leeward side of the courtyard, and the hatch to do a double, with a quality cover.Do not forget the ventilation pipe, which should go beyond the well for at least 0.6-0.8 m.

filtration system is more efficient, but it is still more suitable for those farms, which produce an average amount of wastewater.As in the previous case, the walls do most preferably of bricks or concrete rings.Such sewerage well to do a minimum depth of 2.5 meters, and its width should be no less than one meter.Exterior construction wakes quality building rubble, which is poured in a layer of about 0.3 m. Note that the inner wall of the tank must be carefully plastered using dense grout.

But experts agree that the private home is better suited septic tank.Its design is based on a system of interconnected wells.As in the case of filtration type, each of them should have a depth of not less than 2.5 m, but the width is preferably 1.5 m. The volume capacity is calculated so that the total amount of incoming waste water may remain there for at least three days.It is also important quality ventilation system, since it is the presence of air is the major contributing factor of the biological decomposition of wastes, which is characterized by a sewerage well of this type.

must be said that the construction of any sewage system must be most strictly follow all sanitary regulations.It is because of certain health standards sewer pit, the price of which can be very attractive, may not suit you.Explore construction norms in the field.Perhaps, for the construction of a major drainage system you will have to negotiate with the representatives of local authorities.100% of them have to say when in your area groundwater come close to the soil surface.