planned schedule of construction is one of the most important documents in the organization, planning and management in the design of construction projects.This document describes the installation and construction works, and their primary sequence, in accordance with the required deadlines for their implementation, as well as the types of work and volume.
planned schedule of construction has a single main purpose, greatly simplifies the process of scheduling.Creates a construction schedule that defines and technologically connect different types produced by different teams work, taking into account the correct, timely and efficient provision of those teams with the necessary technical or material resources, mechanized equipment.Also, this schedule allows for strict adherence to the terms of work, remember the exact time of commissioning.In addition, the construction of production ensures constant material and technical support for the entire period of construction work.
During the construction of entire neighborhoods, neighborhoods and individual building complexes schedule
At the time of the timetable building the entire complex installation and construction work is taken into account in a generalized form.If the object is a building, then calculates all the auxiliary and the adjacent buildings, as well as existing highways, roads, utility networks and other communications.Also taken into account the presence of landscaped area around the object and its landscaping.
Consider the basic data and conditions necessary for drawing up the timetable of works:
1. The conditions under which the construction of facilities and the installation of the individual designs.
2. Main Sources of the project, such as a master plan or shooting location, construction documents, construction and manufacturing drawings.
3. Precise knowledge of the time required to carry out all the work.
4. A clear concept of the scope of work and cost.
5. Availability of basic materials and structures which are indispensable for construction and installation work.As well as an agreement on the delivery of objects.
6. Have agreed parts of construction projects within the organization and coordination of the project with the various jurisdictions.
7. Availability of the necessary regulatory, references and literature.
8. Issuance of building permits.
In drawing up the timetable of works, you first need to clearly detail the work to be carried out during construction.The main thing you need - is to select everything and adjacent to the auxiliary erecting a building project, as well as temporary structures, built only during the construction period.
also need to take into account the pricing policy of the work, their volume, the demand for building materials, special designs.Based on all the above components, as well as the manpower to calculate man-hours and is filled first, the left-schedule construction of any object or group of objects.
planned schedule of construction is a very important document, and its accuracy can greatly increase the efficiency of the construction project.