Network Engineering: classification, features prektirovaniya

click fraud protection

Currently, network engineering have in any home.It is impossible to imagine a modern home without it.Engineering Network is a system of heating, sanitation and water supply.Experts draw up a draft of all the above constructions, interior and exterior, for convenience of the subsequent operation of citizens.Professionals build network engineering and construction quality and qualified to the system served for many years.

Domestic Projects utilities

These configurations include the following system.

  1. heating.
  2. firefighting.
  3. ventilation.
  4. conditioning.
  5. sewerage and water supply.
  6. electricity.
  7. lighting.Notices
  8. people about the fire.
  9. Automation.

exterior design of engineering systems

These configurations include the following network.

  1. Electric.
  2. Heat.
  3. Gas Pipeline.
  4. Sewer and pipeline.
  5. Communication and outdoor lighting.
  6. tunnels and reservoirs.
  7. Systems facilities designed to purify surface water.

Safety

Designers must responsibly about their work, as construction of engineering networks requires utmost care and caution.If there is an unexpected failure of one of the systems that will be put in jeopardy all the others.Engineering services provided by the organization that develops engineering networks, represent a comprehensive settlement of one or more communications.Experts who deal with similar activities, must not allow negligence while performing their duties.Serious attitude to this work is fraught with disasters that may carry human lives.

ventilation and conditioning

design of such systems takes place in several stages.Initially, the scheme is about.Then take into account the wishes of the customer.On this basis, shall be amended accordingly.Only after this is made "clean" project.When working on a scheme of ventilation specialists should carry out a number of technical calculations.It is necessary to count the number of points of air supply and exhaust systems, check the suitability of the premises and its scope.After completing all the necessary measurements professionals need to calculate the approximate cost of equipment, materials and mounting.They should also determine the timing of all this work.

Heating

comfort in homes in the autumn-winter period depends on the quality of design of heat supply.In order to make the scheme effective heating systems, experts need to examine the presence of homes heat loss.They must arrive at the subject and make all necessary measurements in each apartment home.Employees are required to check the status of doors, windows and walls.After receiving all the data, evaluating the condition of the house, prepared the best project of the heating system for the building.Experts may choose to implement it one of two types of heating systems: air or water.Each of these types has its pros and cons, which are accounted for in the design of individual buildings.

Water

like sewer, water system can be divided into two types: internal and external.The first involves wiring a large number of pipes to supply water to the premises, as well as installation of equipment: mixer, toilet, sink and a filter for cleaning.Second engineering network is a highway which cuts into the central pipe.

Features

water supply project of water supply systems of buildings is very responsible.She enters the premises from external systems.Hot must be submitted in a house with a maximum temperature of 75 ° C.At the same time, cold water, including drinking water, is carried out at a temperature of 30 ° C.Water enters the centralized systems.The supply comes from natural sources such as surface (rivers, reservoirs, lakes) and groundwater.

sewerage network

Engineering systems of this type provide structure to clean the fecal waste.It must be mounted in a central sewage system.Draft internal system consists of several plastic pipes, which are fed by sewage equipment (bath, toilet and wash basin).

Power supply

Such engineering network is designed only considering building regulations.Creating a scheme depends on the customer's wishes, he can determine exactly where will be installed sockets and switches.Each element, which supplied electricity to be reflected in the draft.